At a constant velocity, a 5kg bag of cement is pulled straight up a 7m wall. How much work is done by the puller? (Gravitational pull is 9.8m/s2, W(J)=F(N)*D(m)

A. 343 m/s2
B. 343 N
C. 340 J
D. 343 J